Physical unpack, wall and floor connection & battery installation
FoxESS AIO inverter wiring for essential vs non-essential loads.
All loads both essential light loads and non-essential heavy will be fed solar power first, battery power second and grid power as a last resort. Essential loads shown in red below will remain powered during load-shedding.
There is a permanent 6kW load limit in place on the essential or Emergency Power Supply (EPS) load circuit.
There is no load limit on the grid-tie side of the inverter as power shortfalls will be drawn from the grid.
Full-length video: FoxESS AIO inverter step-by-step configuration guide, firmware update and setup.
How to video on how to connect your FoxESS AIO Inverter to your WiFi Hotspot
In this video, we show you how to create a FoxESS installer account and how to bind your customer's inverter serial # to your installer account.
FoxESS Cloud APP Battery Settings
FoxESS Cloud for Installers
FoxESS Cloud for Customers